Dealer Price

$13,995
1/35

2026 Jayco® Jay Feather Air SL

15TBSL

$234
per month
4.5
% APR
$1,399
Down
60
Months

Confirm Availability

Vehicle Location

Kunes Wisconsin RV World

5920 Haase Rd, DeForest, WI 53532

View all vehicles at this location

Estimate your payment

Get a quick payment estimate based on basic loan terms.

Basic information

Stock #

VIN

Description

JAYCO JAY FEATHER AIR SL

(2026) These Typical Features Vary by Model
Customer Value Package

Living Spaces
Power Awning
Porch Light
Keyed-Alike Doors
LED Lighting Throughout
Vinyl Flooring
Dark Tint Safety Glass Windows
Pleated Window Shades
Hardwood Cabinet Doors
Cabinet Door Hidden Hinges
Full-Extension Drawer Guides

Dining
Plywood Dinette Base
Residential Style Countertops
High Rise Faucet
12v 5cf Refrigerator
2-Burner Cooktop
Microwave Oven
Power Vent

Technology & Entertainment
Backup Camera Prep
Digital TV Antenna

Sleeping
Queen Bed
300#-Rated Single Bunk
600#-Rated Double Bunks
Plywood Bed Platforms

Bathroom
Wood Trimmed Mirror
Tub Shower Surround
Marine-Grade Foot Flush Toilet
Power Vent

Mechanicals
Roof Mount Solar Prep
20# LP Bottle
30-Amp Detachable Service Cord
120v Receptacle
Inverter Pre-Wire Receptacles
13.5k Roof AC
19k Furnace
On Demand Tankless Hot Water

Chassis Build
Front Tongue Jack
Fully Integrated A-Frame
Self-Adjusting Brakes
Easy-Lube Hubs
Galvanized Steel Wheel Wells
Nitrogen-Filled Radial Tires

Vacuum-Bonded Sidewalls
Interior and Exterior Azdel
Magnum Truss Roof System
Seamless PVC Roof Membrane
Large Downspouts
Stabilizer Jacks
Rear Bumper
LED Exterior Lights
Slide Topper Prep

Dealership Information

Sunday

Closed

Monday

9:00am - 5:00pm

Tuesday

9:00am - 5:00pm

Wednesday

9:00am - 5:00pm

Thursday

9:00am - 5:00pm

Friday

9:00am - 5:00pm

Saturday

9:00am - 3:00pm

Kunes Wisconsin RV World

2026 Jayco® Jay Feather Air SL

15TBSL

$234
per month
4.5
% APR
$1,399
Down
60
Months

Confirm Availability